Logistic Pipe JY-4000 Series for Lean Manufacturing - Logistic Pipe JY-4000 Series

Logistic Pipe JY-4000 Series for Lean Manufacturing, 1.Cold Rolled Sheet, 2.Full thickness and color for selction, 3.Ergonomic - details see: https://www.furniturepopular.com/logistic-pipe-jy-4000-series-for-lean-manufacturing-10043777
Type: Furniture FrameMaterial: Metal,Cold rolled sheetMetal Type: IronApplication: Table,Lean manufacturing and DIY furniturs
Place of Origin: Guangdong China (Mainland)Brand Name: JingYuModel Number: Logistic Pipe JY-4000 SeriesColor: Black.ivory,red.etc
Shape: RoundTechnique: Seamless WeldingOuter Diameter: 28mmDesign: Ergonomic and dynamic
Logistic Pipe JY-4000 Series for Lean Manufacturing
contact supplier for Logistic Pipe JY-4000 Series for Lean Manufacturing


Logistic Pipe JY-4000 Series for Lean Manufacturing

Logistic Pipe Breif Introductions

1

Material: thermoplastic(outside)+Iron pipe(middle)+erosion resistant coating(inside)

2

Outer Diameter:27.5mm-28mm;

3

Inner Diameter:19.5mm-24mm;

4

Thickness:0.7mm,0.8mm,1.0mm,1.2mm,1.5mm,2.0mm;

5

Colors:ivory,beige,black,grey,green,blue,red

6

Standard Length:4 meters per piece ,but can be cut into any length as you like ;

7

Surface:PE/ABS material ;

8

Processing: Cold rolled steel→Clean&Cut→Make it Round→Seamless Welded→Spraying antirust inside→Making the pipe rounder and straighter→Plastic Coated→Cooling→Cooling Again→Cutting into the length→Packaging

The significant benefits of the Plastic Coated Steel Pipe

1

The steel pipe is easy to combine with the metal joint to form into the shape and function you want.you can adjust them as you want,all you need is imagination.

2

The Coated Steel Pipe can be recycled and reused for many times,so it is certainly environmental friendly and convenient.

3

By the rack system these items gethered together,you can increase your working efficiencies ,reduce your cost in many aspects,such as manpower,time,materials.etc.

Full Lean Manufacturing Products.

Packaging Detail:plastic bags or carton; 10 pcs per bag; 4 meter per pcs;
Delivery Detail:For normal order , we can send the goods out within 10~15 days

Related Product for Logistic Pipe JY-4000 Series for Lean Manufacturing